6402 – Far South Sewer Lining – City of Chicago (CIPP) 

Benchmark has installed over 200,000 ft of cured-in-place pipe (CIPP) over the past 5 years.  The CIPP process is suited for wastewater pipeline repair and can be used to rehabilitate sanitary sewers, storm sewers and force mains.  CIPP is a jointless pipe-within-a-pipe with the capability to rehabilitate pipelines ranging in diameter from 9 to 96 inches in diameter. 

Benefits of using CIPP technologies: 

  • Size ranges from 6” to 96” 
  • Little to no disruption 
  • Less costly than traditional excavation 
  • Less environmental impact 
  • Improved pipe performance 

CIPP 

CIPP offers a proven trenchless repair of aging sanitary and storm sewer pipes.  Digging to replace old infrastructure is expensive and disruptive making it impractical or infeasible in many scenarios.  Roots, infiltration, and all but the worst broken pipes can be repaired in place without a disruptive digging operation.  CIPP offers a minimum 50 year lifespan replacement at a fraction of the price of new pipe while also leading to increased pipe capacity due to reduced friction loss.  All work is performed to ASTM F-1216 and NASSCO standards. 

How does CIPP work? 

A resin impregnated flexible tube is inverted inside of the existing pipe using either air or water pressure.  Once the tube is completely installed and inflated, it is cured by adding heat to the interior of the pipe.  The heat causes a reaction within the resin that leads to polymerization, or hardening, of the resin into a plastic pipe that is full of structural replacement of the existing pipe.  Service connections to the mainline are sealed off during the process and are then reinstated using a robotic cutter. 

Benchmark is ready to help you with your construction needs.

News

Building A Better America

Building A Better America

As this article is being written, the crews from Benchmark are diligently building a new flood control system on the campus of Westview Elementary School in Wood Dale, IL.  This project is being built using EPA funds and will alleviate flooding for tens of thousands...

It’s All in Our Toolbox!

It’s All in Our Toolbox!

There may be no project in Benchmark’s history that highlights the company’s wide-ranging capabilities better than the Wheaton Sanitary District’s Northside Interceptor Replacement.  Over a decade in the making, the project was put out to bid by the WSD in July...

You Deliver… So Do We

You Deliver… So Do We

In February of 2020, the Greater Rockford Airport Authority solicited bids for Phase 3 of its Northwest Cargo Area Expansion.  The project included a robust and diverse scope of activities, designed to provide additional capacity for one of its most prominent...

Infrastructure Solutions

Infrastructure Solutions

The City of Chicago Department of Water Management provides over 1 billion gallons of potable water to residents of Chicago and 125 surrounding suburbs daily.  Their stated mission is to “provide the highest quality drinking water to the Chicago region…”  To do this...

Industry Leadership

Industry Leadership

On September 24th, Benchmark staff attended “The Roundtable Live” in Manteno, IL.  This unique day manages to blend a jobsite, tradeshow, networking opportunity, and a hog roast (yes, a hog roast!) into one of the annual highlights in the Chicagoland construction...

A Commitment to Protecting Lives & Property

A Commitment to Protecting Lives & Property

The Benchmark underground division crosses thousands of both public and privately-owned utilities every construction season.  Coordinating efforts are always made in advance of projects to ensure that these utilities are identified, both on drawings and by locate...

Benchmark’s Safety Program Tackles A New Challenge

Benchmark’s Safety Program Tackles A New Challenge

Like the rest of America, Benchmark has had to rethink its business processes to cope with life during a pandemic.  In mid-March Governor J.B. Pritzker declared construction an essential Illinois industry.  For Benchmark this declaration meant figuring out new ways to...

Goodbye Flooding, Hello Benchmark

Goodbye Flooding, Hello Benchmark

On May 14th the City of Wood Dale issued Benchmark a $9.7 million contract for stormwater improvements.  The city’s residents have long suffered from flooding during periods of heavy rain, which has become a relatively common phenomenon in our region.  Benchmark, Wood...

BENCHMARK construction

Home  |  Company  |  Municipal Infrastructure  |  Utilities & Contracting  |  Site Development  |  News  |  Contact Us

2260 Southwind Blvd.
Bartlett, IL. 60103
(630) 497.1700

© 2020 Benchmark Construction. All Rights Reserved.